Mastodon

We're looking for the trash fence...

Plumbing Upgrade and Starter complete

Posted on Sun 07 June 2009 in Pearson 424

Raw Water Strainer

This weekend I finished installing the starter. Along the way I decided to replace the bonding wire on the starter to the v-drive with tinned wire because the existing wire was corroded. As I was doing this, I also decided to replace the bonding wire from the v-drive to the raw water strainer because it had broken a few months back. Removing the nut on the raw water strainer lead to the strainer breaking.  The strainer (bronze) was bolted to an aluminum bracket with stainless steel screws and it had started to bend at the hanger points. I was planning to replace this fall when I haul out, but turns out I needed to do it today. I put a board on that aluminum bracket and put in a new raw water strainer. All in all it was pretty simple, the new fittings lined up a bit differently, but the new strainer looks great and will provide years of reliable service! I have one more bonding wire to put in, just need a 8 AWG to number 10 screw ring terminal to check that one off the list.

DSC_4505

I also finished installing the starter this weekend after I painted it and let it dry. It pretty much popped right in, I fastened in all the bolts to the block, put the new bonding wires on and then hooked up the battery cables and starter switch. She started up on the first try and water ran well through the exhaust. Everything is look good!

Shower mixer and nozzle mount

Finally, I finished our plumbing upgrade as well by putting in a new shower mixer valve and handheld wall mount sprayer. The original faucet was a 4” on center individual knobs for hot and cold and had a fitting for the shower nozzle right on the faucet. When I pulled this off the wall I was left with two holes in the whole. I put a Shurflo mixer volume control in the bottom hole and a wall mount for the shower nozzle in the top hole. This completes a project I started last summer!


Flu Impacts Productivity

Posted on Fri 06 March 2009 in Projects

Systems - Hull, Systems - Plumbing Slug: flu-impacts-productivity Status: published

Two weeks ago I took off work on Friday to work on a bunch of projects one of which included using epoxy and I wanted to take advantage of the warmer weather and have an extra day to get things done. That Friday went pretty well and I worked on cutting the hole in the cabin top and sealing the edges with epoxy so I can install the mushroom vent for the composting head (more on that to come) but about 11pm that night the Flu (or maybe food poisoning) hit me and I was down and out for about 4 days. Well this weekend I’m feeling much better and Dawn and I are ready to tackle the to do list. Here’s the goals:

  • Finish Installing the mushroom vent in the head
  • Wire up the DC power to the fans in the composting head
  • Change the Oil, Oil Filters and Fuel Filters, remove sediment and water (don’t think we have any water) from the RACOR catch bowl
  • Check the Port water tank for a leak. I think one of my fittings is leaking :-(
  • Check the Propane tank overboard vent – I’ve not expected this since the purchase. I want to make sure its not clogged or broken
  • Secure the Plumbing – All of the plumbing is working great but all the lengths of hose need to secured under the salon floor. Not hard, but time consuming since the work space is so confined

That list feels a little ambitious, but I think we can get it done. I have a bunch of pics from cutting the hole in the cabin top for the vent and I’ll take some more as I get everything installed and do a write up about the installation process.