Windlass Project is ramping up

Posted on Fri 24 September 2010

Preparing to make a huge mess

DSC_8889

This week I got a quote on the work to create a proper chain locker. That estimate was higher than I thought it was going to be so I’ve started to do some of the prep and demolition work myself.

Pictured on the left you can see that I’ve bagged off the beautiful ash battens that Dawn installed and closed off the storage under the v-berth as well.

On the right (if this works), I started doing some demolition. I cut out the floor of the anchor locker and now it’s open to the lower area and will create what I’m calling a chain locker.

When this is all done, the deck will be cut open and a new solid deck without a door is what you see. It will be ship shape and water tight, just like we like it!