Mastodon

We're looking for the trash fence...

Big Weekend

Posted on Mon 21 June 2010

I love to update the blog with checkboxes as we go. Feels good to celebrate the wins and document our progress. As you know we’re working toward stepping our masts on Thursday 24 June.

I got all the pins from Andersen Machine Shop in Port Townsend and they were beautiful. Had a slight mishap with them last week because I put in an incorrect dimension (too long) for some of the pins, but with PT all mail is basically overnight so we were able to send them back have them cut down and get them back in 2 days! I highly recommend Andersen Machine Shop. Olaf is a very nice guy and was very helpful. He made our pins on his CNC machine, they look awesome.  With pins in hand I was able to attach all of the rigging to the masts! I did all that in the pouring “Junary” rain we’re experiencing in Seattle this summer so no pics yet.

On the boat Dawn has been working on the ash battens to line the aft berth, v-berth and open lockers.

DSC_7633

First she’s lining all our lockers with Reflectix Insulation which looks like aluminum foil bubble wrap. We’re laying it in loose along the hull NOT gluing it down. We don’t ever want to have to scrape the hull for a month again. The insulation will keep a tad warmer here in Seattle and a tad cooler in the Tropics. It’s pretty cheap, you can get it at Home Depot and its easy to work with.

Here’s what the battens look like when they are installed. Dawn as always does gorgeous work when I stay out of the way. ;-)

DSC_7635

The only thing left to do before we step the masts on Thursday are to install the mast steps and make some leather grommets for the wiring exits on the main mast. After that I’ll remount the booms and winches along with a couple other things. Right after we tune the rig we should be able to sail again!