Calendar

    <<  February 2010  >>
    MoTuWeThFrSaSu
    25262728293031
    1234567
    891011121314
    15161718192021
    22232425262728
    1234567

    View posts in large calendar

    Pages

    Categories

    Authors

    Blogroll

    Download OPML file OPML

    Disclaimer

    The opinions expressed herein are our own personal opinions and may not represent truthines or reality in any way.

    Pearson 424 Owners

    Wish Lists

    My Amazon.com Wish List

    Photos

    www.flickr.com
    deepplaya's items Go to deepplaya's photostream

    Corinthian Yacht Club



    Protected by Commentor
    6 comments approved
    7 spam caught
    Since December 1, 2008
    Powered by Spam Counter

    Flu Impacts Productivity

    Two weeks ago I took off work on Friday to work on a bunch of projects one of which included using epoxy and I wanted to take advantage of the warmer weather and have an extra day to get things done. That Friday went pretty well and I worked on cutting the hole in the cabin top and sealing the edges with epoxy so I can install the mushroom vent for the composting head (more on that to come) but about 11pm that night the Flu (or maybe food poisoning) hit me and I was down and out for about 4 days. Well this weekend I’m feeling much better and Dawn and I are ready to tackle the to do list. Here’s the goals:

    • Finish Installing the mushroom vent in the head
    • Wire up the DC power to the fans in the composting head
    • Change the Oil, Oil Filters and Fuel Filters, remove sediment and water (don’t think we have any water) from the RACOR catch bowl
    • Check the Port water tank for a leak. I think one of my fittings is leaking :-(
    • Check the Propane tank overboard vent – I’ve not expected this since the purchase. I want to make sure its not clogged or broken
    • Secure the Plumbing – All of the plumbing is working great but all the lengths of hose need to secured under the salon floor. Not hard, but time consuming since the work space is so confined

    That list feels a little ambitious, but I think we can get it done. I have a bunch of pics from cutting the hole in the cabin top for the vent and I’ll take some more as I get everything installed and do a write up about the installation process.


    Tags:
    Categories: Systems - Plumbing | Systems - Composting Toilet | Systems - Electrical | Systems - Hull | Projects

    0 Comments
    Actions: E-mail | Permalink | Comment RSSRSS comment feed

    Comments are closed